DEDICATED BENDING

CAMAS NC.40Z-1200

Servo CNC Busbar Bending Center

The NC.40Z-1200 is part of the CAMAS busbar equipment range. Dedicated CNC bending with servo gauge positioning for formed connections.

15 × 160 mm
Thickness × width
±0.15 mm
Gauge accuracy
±0.3 °
Bending accuracy

Final configuration and tooling are matched to your application.

01 / THE APPLICATION

Dedicated CNC bending and gauge positioning

Dedicated CNC bending with servo gauge positioning for formed connections.

This is a dedicated bending stage; cutting and punching are separate operations. Compare main and alternate-direction capacity, tool clearance and the planned bend sequence. Gauge accuracy in millimeters and angle accuracy in degrees describe different quantities.

Dedicated bending

15 × 160 mm

Application-led configuration

Define your tools and working requirements from the component drawing.

02 / TECHNICAL OVERVIEW

NC.40Z-1200
specifications

CAMAS NC.40Z-1200 technical specifications
Equipment lineBusbar Processing Machinery
ModelCAMAS NC.40Z-1200
Thickness × width15 × 160 mm
Machine weight2500 kg
Motor power5.5 kW
Gauge accuracy±0.15 mm
Bending accuracy±0.3 °
Machine dimensions (L × W × H)3500 × 1450 × 1850 mm
Force40 Ton
Vertical bending (thickness × width)12 × 120 mm
ProcessDedicated bending

Specifications support preliminary selection. Material, hole size, edge distance, bend direction and tooling may impose separate limits. Confirm the supplied configuration in your quotation.

03 / MACHINE CONFIGURATION

Configuration for
NC.40Z-1200

Published model data and the checks to resolve in your quotation.

Published machine configuration

Dedicated CNC bending with servo gauge positioning for formed connections.

Configuration details

Gauge accuracy: ±0.15 mm · Bending accuracy: ±0.3 ° · Vertical bending (thickness × width): 12 × 120 mm

Tooling to define in your quotation

Identify the dies, gauge reference, bend directions and part supports. Include existing bends and minimum flanges so the complete part can be checked.

Supply and site requirements

State voltage, phase and frequency, control requirements and destination. Ask the quotation to distinguish included equipment, options, packing, documentation and installation or training arrangements.

What to include with your drawing
  • Material grade, maximum thickness and width
  • Hole dimensions, bend direction and tooling requirements
  • Expected quantity and repeated dimensions
  • Electrical supply, destination and delivery requirements

For a machine review, include the sample operation, critical feature and finish you want to check. Ask CAMAS for model-specific footage or sample details when requesting your configuration.

04 / BEFORE YOU CHOOSE

Before you select
NC.40Z-1200

What is the difference between gauge and bending accuracy?

Gauge accuracy describes the positioning reference in millimeters; bending accuracy describes the formed angle in degrees. Confirm the datum, material, tool and measurement conditions for your actual part.

How do I know this configuration fits my part?

Send the finished-part drawing, material, dimensions and quantity. Review tooling access, working capacity and handling together before selecting the configuration.

What tools are included?

The agreed quotation defines the supplied blades, dies, cutters, gauges and accessories. Include your required holes, angles and features so the tool package can be itemized.

Can I specify the electrical supply?

Include voltage, phase and frequency in your inquiry. Electrical variations and control requirements should be confirmed for the specific configuration.

How are delivery and support arranged?

Delivery timing, packing, installation, training and spare-parts scope are agreed for the project. Share the destination and your site requirements when requesting a quotation.

CONTINUE EXPLORING

Other equipment to consider.

CAMAS / EQUIPMENT INQUIRY

Tell us what you need to make.

Share your material, part dimensions and target output. We can help you shortlist the right machine and tooling for your process.